Project Description
Mixed Use Development – Carried out contract review and prepared application for additional cost entitlement including extension of time analysis. Additional cost application in excess of £2m.
The Challenge
  • We had to ensure that all contract entitlements had been considered and that appropriate evidence was available to successfully prosecute the contractor’s position.
The Solution
  • We immediately reviewed the project correspondence and records and discussed matters with both the contractor’s commercial and construction management team.
  • Through a systematic analysis of all the correspondence and records, we offered options and valuable advice on the way forward.
  • We established the strategy and advised as to the likely outcome.
  • We drafted further correspondence for the contractor in respect of ongoing issues.
  • The overall strategy was to submit a robust claim as soon as possible to hopefully assist in a negotiated settlement and if not use the claim as the basis for adjudication.
The benefits
Better
  • The claim was submitted and following numerous meetings a satisfactory settlement was concluded.
  • We demonstrated added value to the contractor by proposing strategies that had not been considered that impacted on claim value.
  • The robust nature of the claim assisted in the negotiated settlement and the contractor maintained its relationship with the client.
Cheaper
  • We saved the contractor both time and money through the use of in-house resources directed by our expertise. The team was led by us and supported by relevant experts, thereby removing the need for the contractor to identify and brief external lawyers and experts. Although lawyers were instructed by us to deal with legal issues as appropriate.
  • The cost models that we offered to the contractor shared risk.
  • We added to the contractor’s profit.
Faster
  • Had we not been able to provide a cost effective resource solution which immediately put in place an appropriate strategy to manage the overall claim it is likely that this matter would have drifted on for a longer period and as such would have impacted on the contractor’s cash flow.
Simpler
  • Given our substantial experience in the dispute resolution process and more specifically claim preparation, we were able to deal with issues quickly and with confidence. We identified the contractor’s risk and put in place an appropriate strategy.